粗大的内捧猛烈进出小视频_人妻激情乱人伦_国内精品人妻无码久久久影院导航_国产免国产免费

潛水泵廠家

聯系我們

江門市力士達泵業制造有限公司

地址:江門市江海區滘頭明星村工業區內 

電話:(86)- 

傳真:(86)- 

郵箱:  

網址:jkw91.com

手機: (張生)


漯河三相 380V控制箱

您的當前位置: 首 頁 >> 產品中心 >> 漯河控制箱系列

漯河三相 380V控制箱

詳細介紹

380V控制箱.jpg



▼剖面分解圖/Cross section and parts list:


三相控制箱剖面


▼產品特點/Detailed Introduction:


1、每一規格功率的水泵配置同一功率的自動控制箱;

2、控制箱置于無直經日曬雨游、通風良好的環境,避免強烈震動;

3、無空氣開關的規枯品科,需在電源輸入端外接空氣開關(或三相閘刀開關)作隔離開關及短路保護:

4、 保險絲選定:熔斷電流=電機額定電流X(1.5-2);

5、按機內及說明書的兩圖,控設并接好三相電源線,電機線和水位電極線。水位電

校線對線經要求不嚴、主要考慮架空強度。

6.各電級線、電極塔(池)井壁之間不得短路:

7、水源克足,水位不會降至大泵進水口的場合,可以不裝“并電極”,但必須將主線路板上部的微型撥動開關撥至右邊(或在接線端子上將“井極”和“回路”用導線短接)。反之則應撥至左邊:

8.開機最應行細檢查、確認安裝提線正確無誤,三相電源電壓正常,無缺相現象,符合使用最件、方可開機。


1.Each pumnp with rated horsepower should match the automatie controt box with the same horsepower.


2.Do not expose the control box to the strong sunlight or get it wet by tain, Put it in a well-ventilated place, and avoiding strong shock.


3.The live wire of three-phase power should go through on-off switch, the zero wire can go through directly.


4.Fuse requirement:fusing current = rated current X (l.5~2)


5.The water-level control of headwaters and water tower needa only an electrode conducting wire and a return conducting wire. The upper and lower limits of the water level can be differentiated by special "level divider". One side of it has a conducting wire, which should be connected with the terminal ot "well electrode" or "tower electrode"; the other side has two conducting wires. of which the short one is the water-level upper limit conductng wire, while the long wire is the water-level lowor limit conducting wire.Both conducting wires can be connected with electrode detector respectively and be put at the required water levels. If the electrode cannot reach the required depth, the conducting wire can be lengthened. The return electrode must be placed under upper and lower electrodes.


6.Short circuit should be avoided between various conducting wires, electrode, and the wall of the well or tank.


7."Well Electrode" could not be installed if water is sufficient, and the water level will never be lowered to the intake of the pump, but the micro switches on the upper part of the main circuit board should be turned to "right"(or connect terminal "well electrode" with "return electrode"),otherwise the switches should be turned to "left".


8.Check the connection of wires and make sure the a installation, the three phase power voltage is right, and no phase vacancy. then turn on it.



本文網址://jkw91.com/product/571.html

關鍵詞:三相控制箱,380V控制箱,力士達380V控制箱

最近瀏覽:

相關產品:

相關新聞:

  • 在線客服
  • 在線留言
  • 在線咨詢